Building No.5
Installation 1990
The site is a two story office building that was to be demolished within the following month. It had three possible points of entry. Both the first and second floors had a corridor 40 meters in length with a stairwell at each end. On the 28th September 1990, 380 individual shoes all painted yellow, were placed a pace apart, pointing in the same direction, completing an entire round of the corridors and stairs.